Torringford Elementary School
Torringford Elementary School
Torrington, ConnecticutThis project consisted of a 57,000 SF addition to an existing 45,000 SF Elementary School. The existing steam heating system was completely removed and replaced with a 4-pipe hot water/chilled water system. The classrooms are heated and cooled with 4-pipe unit ventilators. The administration and assembly areas have 4-pipe heat recovery units with VAV boxes.
Phase
Completed
Delivery Method
Budget
Size
![](https://modernmech.com/wp-content/uploads/2019/04/16267-1-375x375.jpg)
![](https://modernmech.com/wp-content/uploads/2019/04/16266-1-375x375.jpg)